UK - Wide ground engineering

Continuous Flight Auger (CFA) Piling

Low-vibration bored piling for efficient, high-capacity foundations across a wide range of ground conditions.
UK-Wide Delivery
Mon-Fri, 8:00 - 17:00
Restricted Access Capability
Specialist equipment for challenging site restrictions
Single-Source Service
Piling, foundations and associated civils managed under one experienced team.
What we do

Efficient bored piling for demanding foundation requirements

Contiguous Flight Auger (CFA) piling provides an efficient bored foundation solution for projects where load capacity, installation speed and reduced vibration are important considerations. A continuous flight auger is advanced into the ground before concrete is pumped through the hollow stem as the auger is withdrawn, forming the pile before reinforcement is installed.

The method can be used across a broad range of ground conditions and is particularly useful on busy or sensitive sites where the effects of driven piling need to be limited. Its continuous installation process also makes CFA piling well suited to projects requiring multiple pile positions and an efficient programme of works. The final pile design and installation approach can be tailored around structural loading, ground conditions and site constraints.

Low Vibrations

Bored installation suited to sensitive sites

High Capacity

Designed around demanding structural loads

Efficient Installation

Productive installation across larger pile layouts

Versatile Application

Suitable across a broad range of project types

How Continuous Flight Auger (CFA) Piling Works

CFA piles are installed using a continuous flight auger advanced to the required depth. Concrete is pumped through the hollow stem as the auger is withdrawn, allowing the pile to be formed while the bore remains supported by the auger and concrete. Reinforcement is then installed into the fresh concrete in accordance with the pile design.

The continuous process makes CFA piling particularly effective where productivity and reduced vibration are important project considerations.

Best Suited For

Commercial Developments

Efficient foundations for larger schemes

Residential Developments

Versatile support for new structures

Urban Sites

Reduced vibration near neighbouring buildings

Sensitive Locations

Where driven piling may be unsuitable

High structural loads

Designed for demanding foundation requirements

Repetitive layouts

Efficient installation across multiple pile positions

Need practical advice before you enquire?

Speak to the team for quick guidance on your piling or foundation challenge.

The Process

A clear route from initial enquiry through to quotation and project delivery

1

Share site details

Tell us about your site constraints & project objectives

2

Review service options

We compare suitable methods to outline pros & cons, as well as other considerations

3

Receive expert advice

Get our expert guidance on buildability, programme fit and access.

4

Move to quotation

We confirm next steps to support smooth delivery throughout the project’s duration

Related Projects

Providence Hill, Bursledon

SPS developed a combined piling package incorporating driven steel sheet pile retaining walls and 450mm
Find out more

110 Panorama Road

SPS were appointed to deliver 42 CFA Piles, and a Secant Piled Wall to support
Find out more

‘Pastures’, University of Essex

Specialist Piling Solutions delivered 685 CFA bearing piles across five plots, with a further 28
Find out more

See more of our work

Explore all of our completed projects across various sectors

Before you choose a service

Frequently Asked Questions

What is the difference between CFA and Rotary Bored piling?

Both are bored piling techniques, but CFA uses a continuous flight auger with concrete pumped during withdrawal. Rotary bored piling provides greater flexibility in drilling tools, pile dimensions and bore-support techniques.

CFA is generally considered a low-vibration method because the ground is bored rather than displaced by driving.

Yes. Material removed by the auger is brought to the surface during drilling and needs to be managed as part of the site works.

Useful information includes the site location, structural loads, drawings, ground investigation data, proposed pile layout and any known access or neighbouring-property constraints. SPS can review the available information and advise whether CFA piling should be considered.

Discuss a site, scheme or challenge

Our team is ready to help you find the right piling or foundation solution.