UK - Wide ground engineering

AFCB Phase 1

SPS installed 266 CFA bearing piles for the first phase of AFC Bournemouth’s new multi-million-pound training complex, including the main indoor training ‘Dome’.
Client
AFC Bournemouth
Location
Bournemouth
Sector
Leisure
Services
CFA
Scope
266 CFA
Overview

AFC Bournemouth have appointed SPS to assist them with the redevelopment of a 57-acre site for a new multi-million pound training complex. Phase 1 is the creation of the ‘Dome’ a large structure housing indoor training pitches. The dome is directly linked to Phase 2, which brings the rest of the facility together.

SPS installed 266 No. 350mm diameter CFA bearing piles.. Piles were constructed using C28/35 concrete to DC-2 classification and reinforced with 5H20 cages. The system was designed to support compression loads up to 230kN, horizontal loads up to 50kN and tension loads up to 55kN, with 100% integrity testing undertaken.

Specialist Piling were part of a team consisting of over 10 different companies to deliver this project.

Key Figures

Acre Site
0
CFA Piles
0
Diameter
0 mm
Compression
0 kN
Integrity
0 %

Project Gallery

Related projects

Providence Hill, Bursledon

SPS developed a combined piling package incorporating driven steel sheet pile retaining walls and 450mm
Find out more

110 Panorama Road

SPS were appointed to deliver 42 CFA Piles, and a Secant Piled Wall to support
Find out more

‘Pastures’, University of Essex

Specialist Piling Solutions delivered 685 CFA bearing piles across five plots, with a further 28
Find out more

Want to see more projects?

Explore nationwide foundation and structural retaining walls engineered to strict municipal regulations.

Discuss a site, scheme or challenge

Our team is ready to help you find the right piling or foundation solution.