UK - Wide ground engineering

King Post Walls

Cost-effective retaining walls using steel posts and infill panels for temporary or permanent applications.
UK-Wide Delivery
Mon-Fri, 8:00 - 17:00
Restricted Access Capability
Specialist equipment for challenging site restrictions
Single-Source Service
Piling, foundations and associated civils managed under one experienced team.
What we do

Practical retaining walls using steel posts and infill panels

King post walls use regularly spaced structural steel posts with infill panels installed between them as excavation progresses. The system provides a practical retaining solution for changes in level, excavations and boundary works.

Their relatively straightforward construction can make king post walls an economical option where a fully continuous piled wall is unnecessary. The arrangement can be adapted for temporary or permanent applications depending on the structural and durability requirements of the project. Post spacing, embedment and infill selection are developed around the retained height, ground conditions, loading and available working space.

Cost Effective

Practical alternative to contiguous piled walls

Flexible Construction

Temporary or permanent applications

Staged Installation

Panels installed as excavation progresses

Simple Retention

Effective where water cut-off is not required

How King Post Walls Works

King posts are installed at predetermined centres along the proposed retaining line before excavation begins. As excavation progresses, infill panels are placed between the structural posts to retain the exposed ground.

The wall arrangement can be adapted around the required retained height, ground conditions and structural loading. Because the system does not create a continuous sealed barrier, it is particularly suited to projects where straightforward earth retention is required without significant groundwater cut-off.

Best Suited For

Level Changes

Practical site retention

Site Boundaries

Retaining ground near plot edges

Temporary Works

Efficient earth retention

Moderate Excavations

Efficient earth retention

Residential Schemes

Practical retaining requirements

Commercial Sites

Cost conscious retaining solutions

Need practical advice before you enquire?

Speak to the team for quick guidance on your piling or foundation challenge.

The Process

A clear route from initial enquiry through to quotation and project delivery

1

Share site details

Tell us about your site constraints & project objectives

2

Review service options

We compare suitable methods to outline pros & cons, as well as other considerations

3

Receive expert advice

Get our expert guidance on buildability, programme fit and access.

4

Move to quotation

We confirm next steps to support smooth delivery throughout the project’s duration

Related Projects

‘Pastures’, University of Essex

Specialist Piling Solutions delivered 685 CFA bearing piles across five plots, with a further 28
Find out more

Riviera Hotel, Bournemouth

Following the demolition of the former Hotel Riviera, this development created 14 new apartments with
Find out more

Okeford Fitzpaine

With planning approved for up to 45 new homes, SPS installed 521 Steel-Case Driven piles
Find out more

See more of our work

Explore all of our completed projects across various sectors

Before you choose a service

Frequently Asked Questions

What goes between the king posts?

The infill material depends on the structural, durability and appearance requirements of the project.

No. They are primarily an earth-retaining solution rather than a groundwater cut-off system.

Yes, where designed with the appropriate structural and durability requirements.

Post spacing is determined through the retaining-wall design and depends on factors such as retained height, ground conditions, applied loads and the type of infill panel being used.

Discuss a site, scheme or challenge

Our team is ready to help you find the right piling or foundation solution.